Home
# The Roundtable / Nap AI: project overview for MP
Written Nov 19, 2026, launch day. Private. For MP (Mateo Popa), from Julian. No passwords, keys or client data are in this file. Production figures live in the CRM and the decks, not here.
## 1. The short version
The Roundtable is the umbrella over the partner agencies (JG Agencies, Precision Capital Group, Factored Financial, SYNRGY, LegacyPoint Financial, BB) and Nap AI. Julian is the final yes on everything. You give the merge on the CRM repo after Julian's yes.
Overnight and today the project built a launch package: three call decks, a leader briefing, a training group sorter and confirm flow, a Mercury walkthrough, a VA script, a Command Center, a join flow redesign, a Briefing Builder and DialRush routing prep. Almost everything is a private preview or an unmerged branch. Nothing live was changed.
## 2. What you need to do (in order)
1. Review the CRM integration branch `claude/project-thread-8bqe1x` in `jg-financial-workspace`. It holds Briefing Builder, the training group confirm draft, Solidify / Sent to AIL, join flow fixes, sold call drafts and the DialRush panel notes. Checks pass except one test that already fails on `main`. About 80 older recruiting, intake and promotion branches were left out on purpose, because their database changes never ran on live. Merge only after Julian's typed yes.
2. Review draft PR jg-financial-workspace #77, "Join flow: compact /join, clearer /start states" (branch `claude/project-thread-7buc82`, CI passing). Before and after screenshots are in `/mnt/project-files/join-redesign/`.
3. Decide the two cleanup PRs: nap-vault #1 (archives two superseded notes) and nap-ai-builds-backup #1 (hand-off pack, large, 43k added lines). Both are drafts and Julian has not approved them.
4. Look at `/mnt/project-files/cleanup/crm-merged-branches.md`. It lists 169 branches in the CRM repo that are already merged and safe to remove. Nothing was deleted. The repo has about 329 branches.
5. Vercel preview is blocked. See section 5.
## 3. What was built and where it lives
### Call decks (launch day)
| Call | Canva | Notes |
| --- | --- | --- |
| 12:00 Inner circle | https://www.canva.com/design/DAHbYJ-Pi0I | Final per the builder. 11 slides, may be merged to about 7 after the 1:00. |
| 12:30 Leaders | https://www.canva.com/design/DAHbYGAhCr8 | Dense 7 slide version. An older copy exists (DAHbYHl-5vE). |
| 1:00 Company | https://www.canva.com/design/DAHbYPe2LL0 | Grey glass, 8 slides. Dark backup is DAHbYGeMKzM. Do not use DAHbYCOnkfA, it was a broken try. |
Open on the Canva decks: pages 9 to 16 of the 1:00 deck are blank and must be deleted by hand. The three podium photo frames on the Leaderboard slide are empty and need photos dragged in. Animations are not set.
Also built: the same decks as Claude slides https://claude.ai/artifact/HBkbT9EEjUKKQViJ5Hdbfk (12:00 has 11 slides, 12:30 has 10, 1:00 has 14), and HTML versions in `/mnt/project-files/briefing-builder/`:
- `1200-inner-circle.html`, `1230-leaders.html`, `1300-company.html` (the three call decks)
- `war-room.html` (the War Room page), `briefing-room.html`, `briefing-builder.html`
- `BRIEFING_BUILDER_SPEC.md`, `HANDOFF-call-decks.md`, and `jg-call-decks-for-grok.zip`
Other call pieces: Launch Call Pack https://claude.ai/artifact/TzcGvvhTtWeMsXbDuE4iUT, Call Walkthrough https://claude.ai/artifact/Xbxmf3kRLmQwVr8Cy8HP9E, Leader Briefing Sheet https://claude.ai/artifact/CjCeBmKAc558Rn8aHBDyN9, Roundtable Briefing Room https://claude.ai/artifact/EHTfXa2V1tdfgGrgTfRZpc.
### Training groups
- Sorter https://claude.ai/artifact/9KfWarJdzMUPrYqCjnxqox. Rules from Julian: groups per MGA, the leader is on the same level as the members, groups with more than 3 in Bookkeeping stay, everyone else stacks to 12 or more. A presenting switch hides dollars. Draft preset is 37 groups across 5 MGAs, leaders still to be named.
- Confirm and opt-out flow https://claude.ai/artifact/Um97yKxU2QcDgCRPmnZYLQ. This is a preview, not live. The CRM draft of it is on the integration branch.
- Mercury walkthrough https://claude.ai/artifact/SeDqwqtThX3xTXmPdWNw8b. Leaders open their own Mercury account and add a bookkeeping admin. We never touch bank accounts.
### VA script
Google Doc: https://docs.google.com/document/d/1ui6It-GD7kdHc5iYRWEK13WvL3XV8lWOyuGoctZw7r4/edit (setter script v2 plus objection cheat sheet, Julian's wording with only DialRush name swaps). A Claude page copy is at https://claude.ai/artifact/G6831YPpg7HTkghgR9YkGK. Not cleared for live VA calls.
### Command Center and workflow pages
- Command Center https://claude.ai/artifact/GkFxeN7FJQZ9ZocZwdBoK1 (v7, passed Fable review). New "To clear this task" section on every task. Browser storage only, so data stays on each device. The sync SQL (`command-center/sql/`) is on hold and has not run.
- Workflow map (5 sections) https://claude.ai/artifact/JmRZnFJPAwHv6Gf3QjYznR
- Work HQ https://claude.ai/artifact/EK4fd8mYpJxsbxb7nwDbAF, and the tonight build plan https://claude.ai/artifact/KcYgYGgLNQCDerFoekr4en
- Connected demo path https://claude.ai/artifact/RKW52wkFtRjKuSDgAFJZgb
- Joiner flow https://claude.ai/artifact/FdN2VdriKAvdk9zM8mfKa2
- Nap AI setup https://claude.ai/artifact/HMDkJM7pecqhTrTdC6vPcr (source in `hq/`)
- Leader scope page https://claude.ai/artifact/9qzGWvXVpa4x1tDPpAp48e
- Choose Your Faction https://claude.ai/artifact/LWBj3RqGLaNnQ2kiW7VRhR
- Morning page Nov 19 https://claude.ai/artifact/TokQJPC5QYoJ3zFx7mWGZH
### DialRush
- Panel mock https://claude.ai/artifact/VtNeayB7UBMEmvn44geUEL, CRM to DialRush map https://claude.ai/artifact/1LcAkPwKCH2BnyMKLByBPb, inbound routing picture https://claude.ai/artifact/PTw7eE4Jhre7sKLcS5zM3D, go-live checklist https://claude.ai/artifact/UsiEm5GakYZHJCevfvzaiL. Files are in `dialrush-panel/`, `dialrush-map/`, `dialrush-routing/`.
- `jg-dialer-bot` (Discord bot on Railway): `dialrush inspect` and `map` work and only look. Inspect upgrade 2 (PR #39) was merged with Julian's yes and was redeploying at 16:05 UTC. The bot's create, deactivate and reactivate routing tools are built but switched off and have never run. They are limited to one Discord user set by a Railway variable.
- At the last check the inbound lead file existed with 0 leads, no practice leads were loaded, and the setter script and playlist priority could not be confirmed. The inspect output is needed to confirm.
- There is no public DialRush admin API. Any CRM-driven change goes through the bot, with a typed yes.
### Other repos
- `nap-ai-demo-site`: Work Mode agency notice merged (PR #25). Julian says never touch this service.
- `nap-ai-onboarding`: Nap AI onboarding builds merged (PRs #3, #4).
- `Julian-work`: project map linking every repo (PR #1 merged).
- Lookbook v2 and v3 PDFs, print files and QR codes are in `merch/`. The v4 is still on the list.
## 4. Review status (Fable reviewer, launch day)
- Passed: Command Center v5 and v7, Briefing Room decks (after fixes), restyled Briefing Room.
- Passed with changes: Leader briefing sheet (8 changes).
- Not a pass, fixes sent: training group confirm flow (7 fixes).
- On hold, fixes sent: Mercury walkthrough (9 fixes), VA script (7 changes, 12 flags open).
- Claude slides: 3 stop-and-fix items. (1) Names next to dollars: Julian has since approved this. (2) The Mercury slides say nothing typed there comes to us, but step 5 adds bookkeeping as a co-owner with full access, so the line is not true as written. (3) "Never replace an existing AIL policy." was missing from the 12:00 and 12:30 decks at review time.
- The Canva decks themselves were not reviewed, the reader could not open the links.
- Weekly numbers come from the live CRM and are not checked against Impact. The figure of 214 active agents was never rechecked.
## 5. Blocked and open
- **Vercel preview.** The jg-portal project has an Ignored Build Step rule, so only `main` and the NAF-KET branch build. The branch above shows "canceled". Julian said he will clear the rule himself, then an empty commit on `claude/project-thread-8bqe1x` starts the build. Risk: a preview reads and writes live CRM data, some pages may fail because keys are Production only, and the link should not be shared.
- **DialRush routing** is off. Needs Julian's yes for each step (merge and redeploy, set the Railway variable, allow Create Playlist, attach and switch on). Not verified on real DialRush: the playlist page and whether the row number is the priority.
- **Two things called Work Mode.** The inbound cockpit in `nap-ai-demo-site` and a CRM "Work mode" in `jg-financial-workspace/web`. Which one Julian meant was an open card.
- **Leaders** for the 37 training groups are still to be named. Joint co-owner for Mercury is still Julian's decision.
- **Not cleared:** the part-time pay plan (counsel check on employee status and licensing), "paid lead program" wording, and the locked license line, which says whose license a person in training writes on is still being confirmed with the carrier and each state.
## 6. Rules everything follows
- No income claims. Any pay or production figure carries: "Illustration, not a promise of income. Results vary."
- Never replace an existing AIL policy. Practice data only, no real client data, SSNs or bank numbers.
- No em dashes. "The Roundtable" is one word. Say "training groups".
- Nothing is pushed to main, deployed, sent or bought without Julian's typed yes. No force pushes, no deletes (archive instead). DialRush, Railway, live CRM data, DNS and money are off limits without his yes.
- Top producers may be shown by name with real numbers from the CRM (Julian changed this Nov 19).
## 7. How to get around
All files are in the shared project folder `/mnt/project-files/`: `briefing-builder/`, `call-pack/`, `command-center/`, `dialrush-*/`, `join-redesign/`, `hq/`, `merch/`, `cleanup/`, `handoff/`. Older handoff: `handoff/Claude-v2.md`.